Abener Energía S.A. ODDZIAŁ W POLSCE

Location: Stalowa Wola (Poland)

Work done:

  • Main mechanical assembly of BOP in 450 MW Combined Cycle Stalowa Wola Project.
  • Piping, support and main equipment.
  • Prefabrication of pipes Main BOP Piping Assembly On-site assembly of structural supports
  • Assembly of manual and automatic valves Assembly of dynamic and static equipment
  • Alignment of pumps 
  • Design, prefabrication and assembly of structural supports for minor pipes
  • Design and execution of hydraulic test circuits
  • Document management and preparation of a Quality Dossier


LEAVE A COMMENT