Location: Stalowa Wola (Poland)
Work done:
- Main mechanical assembly of BOP in 450 MW Combined Cycle Stalowa Wola Project.
- Piping, support and main equipment.
- Prefabrication of pipes Main BOP Piping Assembly On-site assembly of structural supports
- Assembly of manual and automatic valves Assembly of dynamic and static equipment
- Alignment of pumps
- Design, prefabrication and assembly of structural supports for minor pipes
- Design and execution of hydraulic test circuits
- Document management and preparation of a Quality Dossier