Espezamos el montaje de la Cooling tower en Guadalajara [ TORIJA ] para Linde.
We start the assembly of the Cooling tower in Guadalajara [ TORIJA ] for Linde.
Espezamos el montaje de la Cooling tower en Guadalajara [ TORIJA ] para Linde.
We start the assembly of the Cooling tower in Guadalajara [ TORIJA ] for Linde.
Trabajos realizados:
Montaje mecánico principal de BOP en Ciclo combinado 450 MW Stalowa Wola Project. Piping, soportación y equipos principales.
Work carried out:
Mechanical work for connection of lines to the new RTO2 unit at the bioethanol plant for ALCO ENERGY ROTTERDAM B.V.
Civil works
Electrical work consisting of electrical connection and linking up of the new unit from the existing MCC.
Instrumentation work for the correct functioning of the equipment consisting of installing the PT, FSL, LEL: flowmeters and motorized valves.
Customer: ALCO ENERGY ROTTERDAM B.V
Location: ALCO ENERGY ROTTERDAM B.V – Europoort- Rottedam (Netherlands) 10, haven nr 5629.
UREA Tanks EPC project, included:
Detail Engineering – Civil works
Mechanical – Electrical – Instrumentation
Commissioning – start up –
ALCO ENERGY ROTTERDAM – Europoort – Rotterdam (Netherland
Project: EPC Execution of Sulfuric acid tank installation, will be automatically dosed to an existing tank with a new pump, a new flow meter and new PCV-U / FRP line.
Installation of Pumps for aspiration and impulsion, E & I works.
BRL-K903 / 08 certificate has been provided.
Project: Piping and structures for a new phosphoric acid tank.
Installation of piping to 6 pumps from the existing and the new tank, including 6 flow measuring sets and sampling points.
Project: Pipe and structures for a new phosphoric acid tank. Installation of pipe to 6 pumps from existing and new tanks, including 6 sets of flow measurement and sampling points.
Design, installation and start-up of a fire-fighting system using hand-held lances in the refinery sphere park.
San Roque, Cádiz
DESIGN, ASSEMBLY AND COMMISSIONING OF VARIOUS ELECTRICAL INSTALLATIONS AND INSTRUMENTATION IN THE FUEL STORAGE PLANT.
LOCATION: TUROW POWER PLANT – BOGATYNIA (POLAND)
Work Carried out:
Piping works BOP
Manpower dierente scope
Commissioning – start up-
PIPING BOILER BIOMASS PLANT
PREFABRICATION AND ASSEMBLY PIPING AND SUPPORT
MANPOWER DIFFERENT SCOPE
Commissioning – start up-
Biomass Plant Huelva- ENCE (Spain)
UREA Tanks EPC project, included: Detail Engineering – Civil works Mechanical – Electrical – Instrumentation Commissioning – start up – ALCO ENERGY ROTTERDAM – Europoort
Mechanical assembly of recovery boiler (HRSG) in Combined Cycle 450MW Stalowa Wola Project.
Stalowa Wola (Poland)
INDES IN BIOMASS PLANT ENCE HUELVA HAS SUCCESSFULLY PASSED THE FIRST 3 HYDRAULIC PRESSURE TEST OF THE BOILER AND FEEDWATER LINES.
Ph1: 232 bar
Ph2: 255 bar
Ph3: 189 bar
We continue working hard and surpassing milestone.
INDES PERFORMS FABRICATION WORKS FOR THE PROJECT "BIOMASS ELECTRIC GENERATION PLANT" (ENCE PUERTOLLANO) FULLY COMMITTED WITH THE HIGHEST QUALITY REQUIREMENTS, IN COLLABORATION WITH OCA GLOBAL.
Equipment and structure installations in CO2 Linde plant
Alco Energy Rotterdam
By accepting you will be accessing a service provided by a third-party external to http://www.indes-tech.com/